Terje Aven Availability Model Application to the N-1 System with One Unit of Backup Towing Motor Components for Kiln Machine Preventive Maintenance

Main Article Content

Hari Adianto
Gifari Bayu Nashar
Sani Susanto
Arief Irfan Syah Tjaja

Abstract

The kiln machine is one of the pieces of machinery used to produce granite tiles. One of its many crucial components is the towing motor. The production process requires a high-performance and easily accessible kiln unit because it lasts for 24 hours. As a result, there will be less downtime since the extra towing motor can take the place of the damaged one. The Terje Aven availability model calculates the number of towing motor reserves. The availability of kiln equipment has not yet achieved its full potential because the company currently has six backup towing motors.

Article Details

How to Cite
Adianto, H., Nashar, G. B., Susanto, S., & Syah Tjaja, A. I. (2024). Terje Aven Availability Model Application to the N-1 System with One Unit of Backup Towing Motor Components for Kiln Machine Preventive Maintenance. Jurnal Improsci, 2(2), 110–119. https://doi.org/10.62885/improsci.v2i2.492
Section
Articles

References

Bhardwaj, R.K. & Singh, R. (2016). “Stochastic Model of a Cold-Stand by System with Waiting for Arrival and Treatment of Server”, American Journal of Operation Research, Vol. 6 No. 4, pp. 334–342. Available at:

https://pdfs.semanticscholar.org/c671/c35eb8f7fb1c8a55229179719478d33a0e7b.pdf

Carvalho, T. P., Soares, F. A., Vita, R., Francisco, R. D. P., Basto, J. P., and Alcalá, S. G.. (2019). “A systematic literature review of machine learning methods applied to predictive maintenance”, Computers & Industrial Engineering, Vol. 137, November, 106024. Available at: https://www.sciencedirect.com/science/article/abs/pii/S0360835219304838

Ebeling, C. E. (2019). “An introduction to reliability and maintainability engineering”. Third Edition, Waveland Press.

.Ebrahimipour, V., Najjarbashi, A., & Sheikhalishahi, M. (2013). Multi-objective modeling for preventive maintenance scheduling in a multiple production line. Journal of Intelligent Manufacturing, Vol. 26, No. 1, pp. 111–122.Available at:

https://doi.org/10.1007/s10845-013-0766-6

Huang, J., Chang, Q., Arinez, J., & Xiao, G. (2019). “A maintenance and energy saving joint control scheme for sustainable manufacturing systems”, Procedia CIRP, Vol. 80, pp. 263–268. Available at:https://doi.org/10.1016/j.procir.2019.01.073

Huang, J., Chang, Q., Zou, J., & Arinez, J. (2018). “A Real-time Maintenance Policy for Multi-stage Manufacturing Systems Considering Imperfect Maintenance Effects”, Procedia CIRP, Vol. 80, pp. 263–268. Available at: . https://doi.org/10.1109/ACCESS.2018.2876024

Kapur, K. C., & Pecht, M. (2014). “Reliability Engineering”. John Wiley & Sons.