[1]
Mario, V.A. et al. 2026. Production Scheduling Optimization Using The Campbell Dudek Smith (CDS) Method to Minimize Makespan in A Flow Shop Manufacturing System. Jurnal Improsci. 3, 5 (Apr. 2026), 435–452. DOI:https://doi.org/10.62885/improsci.v3i5.1130.