[1]
Setiawan, H. et al. 2025. Integration of Ergo-Manufacturing and Simulation to Minimise Waiting Time for Cracker and Kemplang Production Process Flow (Case Study of PT. Belimo Food Industry). Jurnal Improsci. 2, 5 (Apr. 2025), 293–301. DOI:https://doi.org/10.62885/jurnalimprosci.v2i5.660.