Idris, M. R., & Hermawan, A. (2026). Production Quantity Estimation Method in Continuous Line Flow and Discontinuous Line Flow Systems with Barchart Simulation. Jurnal Improsci, 3(3), 172–192. https://doi.org/10.62885/improsci.v3i3.1035