Setiawan, H., Susanto, S., Rinamurti, M., & Alfian, A. (2025). Integration of Ergo-Manufacturing and Simulation to Minimise Waiting Time for Cracker and Kemplang Production Process Flow (Case Study of PT. Belimo Food Industry). Jurnal Improsci, 2(5), 293–301. https://doi.org/10.62885/jurnalimprosci.v2i5.660