MARIO, Venantius Almas; ALFIAN, Achmad; SETIAWAN, Heri. Production Scheduling Optimization Using The Campbell Dudek Smith (CDS) Method to Minimize Makespan in A Flow Shop Manufacturing System. Jurnal Improsci, [S. l.], v. 3, n. 5, p. 435–452, 2026. DOI: 10.62885/improsci.v3i5.1130. Disponível em: https://annpublisher.org/ojs/index.php/improsci/article/view/1130. Acesso em: 21 apr. 2026.