Setiawan, H. (2025) “Integration of Ergo-Manufacturing and Simulation to Minimise Waiting Time for Cracker and Kemplang Production Process Flow (Case Study of PT. Belimo Food Industry)”, Jurnal Improsci, 2(5), pp. 293–301. doi: 10.62885/jurnalimprosci.v2i5.660.